Case study 01 · Lean Six Sigma · Manufacturing
Cutting Production Downtime 40% with DMAIC
A cross-functional DMAIC project that reduced unplanned production downtime by 40% and lifted productivity by 25% at a packaging manufacturing plant.
- Role
- Operational Excellence Project Team Lead
- Organization
- North American packaging manufacturer
- When
- 2022
- Team
- 8 people · operations, maintenance, quality